Skip to main content

FCC redraws C-band and satellite licensing for 2027 and beyond

The FCC set a 2027 auction for 160 MHz of upper C-band and replaced Part 25 satellite licensing with a new Part 100 framework.

FCC redraws C-band and satellite licensing for 2027 and beyond

The Federal Communications Commission has set rules to auction 160 megahertz of spectrum in the upper C-band, defined as 3.98 to 4.14 GHz, by July 2027. It has also replaced its decades-old Part 25 licensing rules for space and earth stations with a new Part 100 framework.

Together, the moves stretch from terrestrial mid-band spectrum to satellite licensing. The upper C-band sale is meant to create a contiguous 440 MHz block by bridging the gap to lower C-band holdings, while the new satellite framework is built around a surge in low Earth orbit applications over the past 24 months.

Upper C-band auction terms

The FCC said the 2027 auction will make 60 percent more spectrum available than required by law through 3,248 new licenses. It also said the sale will raise tens of billions of dollars for deficit reduction and other national priorities.

The agency estimated the economic impact of the upper C-band plan at $422 billion in GDP, 2.4 million jobs, and $621 billion in consumer surplus. The band will open for use in the top 75 markets in the mainland United States before the end of 2030 and elsewhere by mid-2031.

Incumbent and adjacent licensees providing fixed-satellite services and aviation services are required to leave the upper C-band by the end of 2030. The FAA has coordinated with the FCC on a $4.5 billion radio altimeter upgrade program to prevent 5G interference.

The cost falls on the incumbents

The FCC rules require winning carriers in the 2027 auction to pay the transition expenses for fixed-satellite-service operators. That is the same basic structure the agency used in the lower C-band auction in 2020, which generated about $80 billion from the sale of 280 MHz to AT&T, T-Mobile, and Verizon.

SES estimates its C-band clearing costs will exceed $3.6 billion and require five new hybrid satellites and two in-orbit backups. Eutelsat projects its clearing costs at roughly $750 million.

Part 100 changes satellite licensing mechanics

The FCC has also voted to overhaul its space and earth station licensing process by discarding and rebuilding legacy Part 25 rules from first principles. The new Part 100 framework treats space and earth stations as unified modular systems.

The commission says the change is a response to a rush of low Earth orbit applications that has clogged its legacy systems. The framework also introduces a third category for variable trajectory spacecraft, including space tugs and lunar landers.

What this means for satellite operators

Satellite operators now face two separate regulatory shifts: a C-band clearing schedule that runs into 2031, and a licensing regime that is no longer built around legacy Part 25 assumptions. For fixed-satellite-service operators, the money and relocation burden remain tied to the upper C-band transition.

For LEO and other nontraditional spacecraft operators, the new Part 100 process is the bigger signal. The FCC is moving toward faster processing, but also toward a cleaner classification system that is meant to fit modular deployments rather than custom one-off filings.

2028 spectrum adds another layer

The FCC has said it has several auctions lined up for 2028, including a portion of the 2.7 GHz band and other not yet identified spectrum. The 2.7 GHz block is expected to include 210 MHz and is currently used for government radar, meteorological satellites, and military radiolocation services.

The National Telecommunications and Information Administration has targeted the band for 5G and early 6G development and as a study band for coexistence with legacy radar. CTIA is also lobbying the FCC and NTIA to unlock 400 to 540 MHz of the 4 GHz band and at least 400 MHz in the 7.125 to 8.4 GHz range for next-generation services.

Sources

Frequently asked questions

When will the upper C-band auction happen?
The FCC set the upper C-band auction for July 2027. It covers 160 megahertz in the 3.98 to 4.14 GHz range.
What does the new satellite licensing framework change?
The FCC replaced legacy Part 25 rules with a new Part 100 framework that treats space and earth stations as unified modular systems. It also adds a category for variable trajectory spacecraft such as space tugs and lunar landers.

DROAM News is published by Droam BV, which sells connectivity services. Droam may be mentioned in or benefit from topics we cover. See our Editorial Policy.